Photos taken at the first site visit, before work began. Tap any photo to enlarge.









Location: Carmichael, CA
Project type: Full bathroom remodel, plus laundry room counter and balcony deck repair
Services: Design consultation, permit-ready plans, permits and inspections, demolition, framing, plumbing, electrical, tile, glass shower door, cabinetry, countertops, painting, finish work and composite decking
This Carmichael bathroom had a dated shower kit, worn tile and an old vanity. Tenax Construction turned it into a calm, modern bathroom with a tiled walk-in shower, a frameless sliding glass door, a marble hexagon mosaic accent, a new shaker vanity with a quartz top and a backlit LED mirror. While we were on site, we also updated the laundry room counter and repaired the balcony deck with low-maintenance composite boards.

The Goal: A Brighter Bathroom That Is Easy to Keep Clean
The homeowners wanted a bathroom that looked fresh and stayed that way. Their goals were:
- Replace the old shower curb, pan, enclosure and shower kit with a fully tiled walk-in shower
- Use large-format tile to cut down on grout lines and cleaning
- Add a built-in niche for shampoo and soap
- Install a new vanity with soft-close drawers, a quartz top and better lighting
- Upgrade the floor tile, baseboards, fan and accessories
Step 1: Design, Plans & Permits
We started with a design consultation to collect the homeowners’ requirements, then developed, presented and refined the design until every detail was final. Tenax prepared a permit-ready set of plans, submitted the permit paperwork and scheduled and attended all required inspections. Government fees are paid directly by the homeowner.
Step 2: Demolition
After protecting the surrounding surfaces, our crew removed the floor tile, wall tile, baseboards, shower curb, pan, enclosure and shower kit, the vanity with its sink, faucet, light and mirror, and the toilet. Debris was hauled away and the room was cleaned before the next phase.
Step 3: Framing, Rough Plumbing & Electrical
With the room open, our framers made the framing adjustments needed for the new layout, including blocking for the niche and fixtures. Plumbers installed new supply and drain lines and a new shower valve, and electricians completed the rough-in for the vanity light, recessed lighting, a new exhaust fan and a GFCI outlet at the vanity.
Step 4: Shower Walls & Floor Preparation
We prepared the shower walls and floor for tile and repaired the existing subfloor, including grinding and leveling, so the new tile would sit flat and last.
Step 5: Large-Format Tile, Niche & Marble Hex Mosaic
This is where the bathroom transformed. Our tile installers set large-format gray tile on the shower walls, which means fewer grout lines and a cleaner, more modern look. A recessed niche finished with a white-and-blue patterned mosaic gives the shower a focal point and keeps bottles off the floor. A marble hexagon mosaic adds natural stone texture, and new floor tile ties the room together. Every joint was grouted and finished with trim for clean edges.



Step 6: Frameless Sliding Glass Shower Door
We installed a sliding glass shower door with a fixed side panel and brushed hardware. The clear glass lets light reach every corner of the shower and makes the bathroom feel bigger. Each panel was leveled, anchored and adjusted for smooth operation and a proper seal.

Step 7: Shaker Vanity, Quartz Top & LED Mirror
The new vanity has solid wood shaker doors, plywood boxes, dovetailed soft-close drawers and polished nickel pulls. We topped it with a quartz countertop with an undermount rectangular sink and a single-handle faucet. Above the vanity, a backlit LED mirror provides even, shadow-free light for everyday routines.


Step 8: Finish Plumbing, Lighting & Accessories
Plumbers set the toilet, vanity faucet and shower trim and tested every fixture. Electricians installed the vanity lighting and exhaust fan. We installed new baseboards, painted the walls and trim, and mounted decorative shelves and a coordinated set of towel bars, hooks and holders, with placement confirmed by the homeowners.

Bonus Scope: Laundry Room Counter & Balcony Deck Repair
In the laundry room, we removed the old counter, sink and faucet and installed a new prefabricated countertop with a tile backsplash, an undermount sink and a new faucet.
Outside, the balcony deck needed attention. We reinforced the framing under the deck, replaced the decking with Trex Enhance Naturals composite boards in Rocky Harbor, and applied protective paint and stain to the exterior surfaces. Composite decking resists rot, splinters and fading, so the balcony will need far less upkeep than wood.
The Result
The finished bathroom is bright, calm and easy to care for. Large-format tile and clear glass keep the shower open and simple to clean, the marble mosaic and niche add character, and the shaker vanity with its LED mirror makes daily routines easier. Together with the refreshed laundry room and the rebuilt balcony deck, the homeowners got several upgrades handled by one team.
Why Carmichael Homeowners Choose Tenax for Bathroom Remodels
- Design through completion. We handle the design, permits, inspections and construction.
- Licensed and insured. Tenax Construction Inc. is a licensed California general contractor (CSLB #1057033).
- Clear scope in writing. Every line of work is spelled out before we start.
- Local team. We work throughout Carmichael, Fair Oaks, Arden-Arcade and the Sacramento region.
Frequently Asked Questions
A permit is generally required when a remodel includes plumbing, electrical or framing changes, as this one did. Carmichael is in unincorporated Sacramento County, so permits go through the county. Tenax prepares the plans, submits the application and attends the inspections.
Larger tiles mean fewer grout lines, which makes the shower easier to clean and gives it a cleaner, more modern look.
Most full bathroom remodels take several weeks of construction once materials and permits are in place. We provide a schedule for your project before work begins.
Yes. In this project we also updated the laundry room and repaired the balcony deck, all under one contract.
See More Bathroom Remodels
Browse our bathroom remodeling projects or learn more about bathroom remodeling in Sacramento, walk-in showers, curbless showers, tub-to-shower conversions and primary bathroom remodels.
Similar projects: spa-style bathroom remodel in Folsom, curbless shower primary bath in Granite Bay and our new detached ADU in Orangevale. Planning a budget? See financing options.
Ready to Remodel Your Carmichael Bathroom?
Call (916) 586-8845 or request a free estimate online.
Tenax Construction Inc. · 4205 Cincinnati Ave, Suite 300, Rocklin, CA 95765 · License #1057033
Helpful guides for your project
GuideCurbless shower on a slab foundation: what it takesRead the answer →
GuideHow long does a bathroom remodel take? A phase-by-phase timelineRead the answer →
GuideTub-to-shower conversion: cost, timeline and what to knowRead the answer →
GuideHow much does a bathroom remodel cost in Sacramento in 2026?Read the answer →
Kitchen
ICF home
Bathroom
ICF home
New construction
Whole-home remodel