


































Photos taken at the first site visit, before work began. Tap any photo to enlarge.



Location: Orangevale, CA
Project type: New detached accessory dwelling unit (ADU)
Services: Permit assistance, solar design, site demolition, trenching, underground plumbing, foundation and slab, framing, roofing, windows and doors, insulation, HVAC, electrical, drywall, stucco, flooring, tile and quartz, cabinetry, appliances, painting and finish work
This Orangevale homeowner had an open backyard and a clear goal: add a separate, fully livable home on the same lot. Tenax Construction built a brand-new detached ADU from the ground up — a bright backyard cottage with a covered front porch, an open living room and kitchen, bedrooms with closets, two bathrooms and its own heating and cooling. We handled the permits, coordinated the inspections and managed every trade from the first trench to the final walkthrough.
If you are thinking about building an ADU in the Sacramento area, this project shows what the full process looks like.

The Goal: A Separate, Low-Maintenance Home in the Backyard
The homeowner wanted an ADU that would feel like a real home, not an add-on. The project goals were:
- Build a detached unit that stands on its own, with its own entry and outdoor space
- Create an open living area and a full kitchen with everyday appliances
- Include comfortable bedrooms with closets and two full bathrooms
- Use durable, easy-care finishes: luxury vinyl plank floors, quartz countertops and quartz shower walls
- Keep the exterior clean and modern with white stucco, dark trim and a covered porch
- Meet California energy requirements, including a solar PV system
Step 1: Plans, Permits & Solar Design
Every ADU starts with paperwork. Tenax assisted with the permit process: site plan, site visits, documentation for the building department, and the utility application for the new service. We also prepared the solar design, since new California homes and ADUs are required to include solar.
Throughout construction we scheduled and attended every inspection. Permit and agency fees are paid by the homeowner; Tenax manages the process so the homeowner does not have to deal with the building department alone.
Step 2: Site Preparation, Trenching & Underground Plumbing
Before anything could be built, we removed the existing concrete from the build area and prepared the site. Our crew then trenched for the new utilities. Underground plumbing was installed and passed inspection before the foundation work began. A new conduit and cable were run from the main house panel to the ADU, so the unit has its own electrical supply.

Step 3: Foundation & Concrete Slab
We checked the footing sizes and forms against the structural plans, set the rebar, passed the foundation inspection and poured the footings and the concrete slab. Spring rain filled the trenches at one point, so we pumped them out and waited for the soil to dry before setting rebar — taking the time to do it right instead of rushing a wet foundation. The concrete porch and the sidewalk to the entry were poured as part of the same scope.
Step 4: Framing, Roof Trusses & Roofing
With the slab in place, our framers built the walls and set engineered roof trusses. The roof was finished with architectural shingles, and new gutters and downspouts carry water away from the foundation. The covered front porch was framed as part of the main roof line, which gives the ADU its cottage character and a shaded place to sit.

Step 5: Windows, Doors, Insulation & HVAC
We installed new windows throughout, a sliding glass patio door to the back yard, and a dark entry door under the porch. The walls and ceiling were insulated, and the HVAC system — ductwork plus a ductless mini-split — keeps the unit comfortable through Sacramento summers and winters. Ceiling fans in the bedrooms and living area add extra air movement.
Step 6: Electrical, Plumbing Rough-In & Water Heater
Electricians wired the ADU from its own panel: outlets, switches, recessed lighting, ceiling fan boxes and dedicated appliance circuits. Plumbers completed the rough-in for the kitchen and both bathrooms and installed the water heater. Each stage was inspected before walls were closed.
Step 7: Stucco Exterior, Drywall & Paint
The exterior received a smooth white stucco finish with black fascia, gutters and light fixtures — a clean, modern look that is easy to maintain. Inside, we hung, taped and textured drywall, then painted the walls, ceilings, trim and doors in a bright white that makes the rooms feel larger.

Step 8: Kitchen — White Shaker Cabinets, Quartz & Stainless Appliances
The kitchen is compact but fully equipped. We installed white shaker-style base and upper cabinets, a quartz countertop, an undermount sink with a pull-down faucet and a garbage disposal. The appliance package includes a freestanding electric range, an over-the-range microwave with venting and a dishwasher, all in stainless steel. A window over the sink brings in natural light.


Step 9: Living Room, Bedrooms & Flooring
Warm-toned luxury vinyl plank flooring runs through the living room, hallway and bedrooms. It is water-resistant, durable and easy to clean — a smart choice for a rental or a family member’s home. The bedrooms have sliding closet doors with shelves and poles, ceiling fans, and plenty of natural light. One bedroom opens directly to the back yard through a sliding patio door.


Step 10: Two Bathrooms With Quartz Shower Walls
The primary bathroom features a walk-in shower with marble-look quartz slab walls, an acrylic shower pan, a rain shower head and a sliding glass door. Quartz slabs have almost no grout lines, so they stay clean with very little effort. The second bathroom has a tub-and-shower combination with matching quartz walls.
Both bathrooms have farmhouse-style vanities with black hardware, black-framed mirrors, modern vanity lights, high-efficiency toilets and coordinated accessories.


Step 11: Millwork, Hardware & Final Walkthrough
Finish carpenters installed baseboards, door casings and closet systems. We installed door hardware, bathroom accessories, mirrors and shelving, then completed the final inspections and walked the property with the homeowner to confirm every detail.
The Result
The finished ADU is a true second home on the property: its own entry under a covered porch, an open living space with a full kitchen, comfortable bedrooms and two modern bathrooms. The white stucco and dark trim give it a clean, current look from the yard, while durable finishes inside keep maintenance low. Whether it is used for extended family, a rental or a home office, this ADU adds space, flexibility and long-term value to the property.
Why Orangevale Homeowners Choose Tenax to Build Their ADU
- One team from permits to keys. We handle plans, permits, inspections and every trade, so you have one point of contact.
- Licensed and insured. Tenax Construction Inc. is a licensed California general contractor (CSLB #1057033).
- Clear scope. Every phase is defined in writing before work starts, and changes are approved in writing.
- Local experience. We build and remodel across Orangevale, Fair Oaks, Citrus Heights, Carmichael and the greater Sacramento region.
Frequently Asked Questions
In most cases, yes. California law allows ADUs on most single-family lots, and Orangevale projects are permitted through Sacramento County. Setbacks, size and utility connections depend on your lot, so we review your property before design starts.
Timelines depend on design, permitting and the season. Construction itself typically runs several months once permits are issued; weather, inspections and utility work can affect the schedule. We give you a schedule for your specific project during planning.
New detached ADUs are generally required to include a solar PV system under California’s energy code. Tenax includes solar design in the planning phase so it is accounted for from the start.
Yes. We prepare and submit the paperwork, coordinate with the building department and utility, and schedule and attend all inspections. Permit fees are paid directly by the homeowner.
See More Projects
Browse our new construction projects, learn more about our ADU building services, or compare other ways to add space: garage conversions, room additions and fire-resistant ICF ADUs.
Also completed nearby: a walk-in shower bathroom remodel in Carmichael, CA. See the full project portfolio or check financing options.
Ready to Build an ADU in Orangevale?
Tell us about your lot and your plans. Call (916) 586-8845 or request a free estimate online.
Tenax Construction Inc. · 4205 Cincinnati Ave, Suite 300, Rocklin, CA 95765 · License #1057033
Helpful guides for your project
GuideHow long does it take to build an ICF custom home?Read the answer →
GuideCan an ICF home look like a normal house? Styles and finishesRead the answer →
GuideICF vs. wood frame: energy savings in a California climateRead the answer →
GuideAre ICF homes fire resistant? What a 4-hour fire rating meansRead the answer →
ICF home
Bathroom
Bathroom
Whole-home remodel
New construction
Bathroom


