× ‹ ›
Pacific Palisades · Altadena · Malibu · Los Angeles County

ICF Custom Home Builder in Los Angeles

NUDURA ICF custom homes and fire rebuilds for Los Angeles: noncombustible concrete walls, engineered for seismic design, with LADBS or LA County permits coordinated.

  • Noncombustible walls with up to a 4-hour fire rating
  • Steel-reinforced concrete, engineered for seismic design
  • LADBS or LA County permits coordinated for you
5.0 on Google125+ reviews
20+ ICF Homesbuilt with NUDURA
LicensedCSLB #1057033
BBB A+Accredited
Free · No obligation

Get your free ICF consultation & plan review

Mary B., Client Relations Manager
Mary B.Client Relations Manager

Takes 30 seconds. Mary responds right away — Mon–Fri 8 AM–5 PM, Sat 8 AM–1 PM. Sent after hours? We'll call you by 9 AM the next business day.

Your info stays private. No spam, ever.

BBB Accredited Business NUDURA insulated concrete forms NAHB member
20+ICF homes built with NUDURA
4hrFire-resistance rating, up to
5.0★Google rating · 125+ reviews
100%Licensed & insured · #1057033
Los Angeles · Fire rebuilds

Rebuilding with walls that do not burn

The January 2025 Palisades and Eaton fires destroyed thousands of homes in Pacific Palisades, Altadena and nearby communities. Many owners are now choosing concrete for their rebuild, so the next fire meets a house that does not burn.

NUDURA insulated concrete form walls are steel-reinforced concrete between two layers of insulation. They are noncombustible, with a fire-resistance rating of up to 4 hours, and a structural engineer designs them for Los Angeles seismic requirements. The same walls make the house quieter and cut heating and cooling loads.

We manage design coordination, engineering, permits and construction as one team, so you have one contract and one point of contact from the first sketch to move-in.

Planning

What to plan for when you build in Los Angeles

Site clearance and testing

Before design, the lot needs debris removal and often soil testing. We review what has been done on your parcel and what the permitting agency still requires.

Which agency, which rules

City of Los Angeles, LA County and each independent city have their own rebuild processes, and several were streamlined after the 2025 fires. We confirm the current path for your parcel before design starts.

Hillside and canyon lots

Many Palisades and foothill lots are steep. Expect a geotechnical report, engineered foundations and retaining walls; ICF can build those walls as part of the same structure.

Fire rebuild guide

Rebuilding after the Palisades or Eaton fire: step by step

The order most rebuilds follow, from a cleared lot to move-in. Rules change, so confirm each step with the permitting agency for your parcel.

  1. Confirm the lot is cleared and tested

    Debris removal should be finished and signed off, and soil testing done where the program requires it. Keep the paperwork: the permitting agency and your lender will ask for it.

  2. Survey, soils and the old foundation

    A boundary survey and a geotechnical report come first on most hillside lots. An engineer decides whether any part of the old foundation can stay; ICF walls are heavier than wood framing, so many foundations are replaced.

  3. Check your fire hazard zone and zoning

    Look up your parcel on the state Fire Hazard Severity Zone map. In mapped zones, Chapter 7A wildfire construction rules apply. Confirm setbacks, height limits and whether your rebuild qualifies for any like-for-like process. Several rebuild processes in Los Angeles were streamlined after the 2025 fires, and some like-for-like rebuilds move faster. Check the current rules for your parcel before design.

  4. Design the whole house to resist fire

    Noncombustible NUDURA ICF walls with up to a 4-hour fire rating, a Class A roof, ember-resistant vents, enclosed eaves, tempered or dual-pane windows and a noncombustible zone around the house. Structural engineering covers seismic design at the same time.

  5. Submit for permits

    Plans go to LADBS (City of Los Angeles), LA County Public Works (Altadena and other unincorporated areas) or your city. We prepare the set, answer plan check comments and keep you updated on where the review stands.

  6. Build, inspect and move in

    Foundation, ICF walls and concrete pours, roof and dry-in, then systems and finishes. Inspections happen at each stage, and the final inspection closes the permit.

New to ICF?

See how an ICF wall compares to wood framing, what an ICF home costs and every ICF home we have built.

What Clients & Engineers Say

Trusted by homeowners — and by the engineers we build with

★★★★★
“I've had the opportunity to work with Tenax Construction on multiple projects as the engineer of record… Their approach to design and construction is practical and focused on efficient execution in the field, with a consistent standard of quality across conventional residential and high performance, high end construction.”
EA
Erin A.Engineer of record · Google review
★★★★★
“We had an overall great experience… for our total whole house renovations and ADU detached garage conversion. We went with [them] against other companies for their in house team on all aspects of the process (design, electrical, plumbing, planning, and supplies)… [He] handles all interactions with the city on permits and inspections.”
JN
Jackie N.Whole-house renovation + ADU · Google review
★★★★★
“[They] delivered an outstanding full house remodeling experience. Their professionalism, expertise, and commitment to excellence were evident at every stage of the project… Their communication was top-notch, and they managed the project within the agreed-upon budget and timeline.”
SK
Sergey K.Full-house remodel · Google review
FAQ

ICF home questions Los Angeles homeowners ask

Do you build ICF homes in Los Angeles?

Yes. We build NUDURA ICF custom homes across California, from the Sierra foothills to Los Angeles, including fire rebuilds.

Who issues the permit for my rebuild?

It depends on the parcel. Pacific Palisades is in the City of Los Angeles, so LADBS issues permits. Altadena is unincorporated, so LA County Public Works Building and Safety does. Malibu and Pasadena have their own departments. Rebuild rules and streamlining have changed since January 2025, so check current requirements for your parcel.

Is an ICF home more expensive than wood framing?

An ICF home typically costs about 5–10% more than a comparable wood-frame home. In return you get noncombustible walls with up to a 4-hour fire rating, a quieter house and lower heating and cooling loads.

Can you build on my existing foundation?

Sometimes, but it needs an engineer's review. Fire-damaged foundations often need testing, repair or replacement, and ICF walls are heavier than wood framing. We start with a site and foundation assessment.

Start Your ICF Home

Get Your Free ICF Consultation, Plan Review & Preliminary Budget

Tell us a little about your project. We'll take it from there.

  • 1
    Mary responds right awayMon–Fri 8 AM–5 PM · Sat 8 AM–1 PM. Sent after hours? We'll call you by 9 AM the next business day. A quick conversation about your lot, goals, budget and timing.
  • 2
    Plan & site reviewWe review your lot and plans — or your ideas — and what your county will require.
  • 3
    Preliminary budget & timelineSee what your ICF home will take, then decide. No obligation.
Prefer to talk now?(916) 586-8845
Free ICF Consultation

Tell us about your ICF home

Mary B., Client Relations Manager
Mary B.Client Relations Manager

Four required fields — the rest helps us prepare for your call. Nothing is shared outside Tenax.

Secure & private. No spam, ever.

Call Free Consultation