× ‹ ›
Santa Cruz County · Monterey County · Carmel · Big Sur

ICF Custom Home Builder in Santa Cruz & Monterey

NUDURA ICF custom homes for the Santa Cruz Mountains and the Monterey Peninsula: noncombustible walls for fire country, reinforced concrete for earthquake country.

  • Noncombustible walls with up to a 4-hour fire rating
  • Steel-reinforced concrete, engineered for seismic design
  • Coastal and county permits coordinated for you
5.0 on Google125+ reviews
20+ ICF Homesbuilt with NUDURA
LicensedCSLB #1057033
BBB A+Accredited
Free · No obligation

Get your free ICF consultation & plan review

Mary B., Client Relations Manager
Mary B.Client Relations Manager

Takes 30 seconds. Mary responds right away — Mon–Fri 8 AM–5 PM, Sat 8 AM–1 PM. Sent after hours? We'll call you by 9 AM the next business day.

Your info stays private. No spam, ever.

BBB Accredited Business NUDURA insulated concrete forms NAHB member
20+ICF homes built with NUDURA
4hrFire-resistance rating, up to
5.0★Google rating · 125+ reviews
100%Licensed & insured · #1057033
Santa Cruz · Monterey

ICF homes for the mountains and the coast

The region runs from redwood ridges above Boulder Creek and Bonny Doon to the coast at Aptos, Carmel and Big Sur. In 2020 the CZU Lightning Complex fire destroyed hundreds of homes in the Santa Cruz Mountains, and many owners now want a house that will not burn.

NUDURA insulated concrete form walls are steel-reinforced concrete between two layers of insulation. They are noncombustible, with a fire-resistance rating of up to 4 hours. They are engineered for the seismic forces of a region shaped by the San Andreas Fault, and they hold indoor temperatures steady through foggy coastal mornings.

We manage design coordination, engineering, permits and construction as one team, so you have one contract and one point of contact from the first sketch to move-in.

Planning

What to plan for when you build in Santa Cruz and Monterey

Steep, forested lots

Mountain parcels often need a geotechnical report, engineered foundations, retaining walls and fire department access review. ICF can build retaining and basement walls too, so the structure is one system.

Coastal permits

Near the coast, a coastal development permit is usually needed on top of the building permit, and design review can apply in Carmel and other cities. We build these reviews into the schedule from the start.

Rebuilding on a burned lot

After a fire, existing foundations rarely suit ICF walls without an engineer's review. We start with a site and foundation assessment so the budget reflects what the lot actually needs.

Fire rebuild guide

Rebuilding after the CZU fire: step by step

The order most rebuilds follow, from a cleared lot to move-in. Rules change, so confirm each step with the permitting agency for your parcel.

  1. Confirm the lot is cleared and tested

    Debris removal should be finished and signed off, and soil testing done where the program requires it. Keep the paperwork: the permitting agency and your lender will ask for it.

  2. Survey, soils and the old foundation

    A boundary survey and a geotechnical report come first on most hillside lots. An engineer decides whether any part of the old foundation can stay; ICF walls are heavier than wood framing, so many foundations are replaced.

  3. Check your fire hazard zone and zoning

    Look up your parcel on the state Fire Hazard Severity Zone map. In mapped zones, Chapter 7A wildfire construction rules apply. Confirm setbacks, height limits and whether your rebuild qualifies for any like-for-like process. In the coastal zone, a coastal development permit is usually needed as well.

  4. Design the whole house to resist fire

    Noncombustible NUDURA ICF walls with up to a 4-hour fire rating, a Class A roof, ember-resistant vents, enclosed eaves, tempered or dual-pane windows and a noncombustible zone around the house. Structural engineering covers seismic design at the same time.

  5. Submit for permits

    Plans go to your city, the County of Santa Cruz or Monterey County. We prepare the set, answer plan check comments and keep you updated on where the review stands.

  6. Build, inspect and move in

    Foundation, ICF walls and concrete pours, roof and dry-in, then systems and finishes. Inspections happen at each stage, and the final inspection closes the permit.

New to ICF?

See how an ICF wall compares to wood framing, what an ICF home costs and every ICF home we have built.

What Clients & Engineers Say

Trusted by homeowners — and by the engineers we build with

★★★★★
“I've had the opportunity to work with Tenax Construction on multiple projects as the engineer of record… Their approach to design and construction is practical and focused on efficient execution in the field, with a consistent standard of quality across conventional residential and high performance, high end construction.”
EA
Erin A.Engineer of record · Google review
★★★★★
“We had an overall great experience… for our total whole house renovations and ADU detached garage conversion. We went with [them] against other companies for their in house team on all aspects of the process (design, electrical, plumbing, planning, and supplies)… [He] handles all interactions with the city on permits and inspections.”
JN
Jackie N.Whole-house renovation + ADU · Google review
★★★★★
“[They] delivered an outstanding full house remodeling experience. Their professionalism, expertise, and commitment to excellence were evident at every stage of the project… Their communication was top-notch, and they managed the project within the agreed-upon budget and timeline.”
SK
Sergey K.Full-house remodel · Google review
FAQ

ICF home questions Santa Cruz & Monterey homeowners ask

Do you build ICF homes in Santa Cruz and Monterey counties?

Yes. We build NUDURA ICF custom homes across California, from the Sierra foothills to Los Angeles, including the Santa Cruz Mountains and the Monterey Peninsula.

Who issues building permits?

Each city has its own building department. Unincorporated areas go through the County of Santa Cruz or Monterey County. Parcels in the coastal zone usually also need a coastal development permit under the local coastal program.

Is ICF a good choice for a rebuild after the CZU fire?

It is a strong option. Concrete ICF walls do not burn and NUDURA walls carry fire-resistance ratings of up to 4 hours. A full fire-resistant design also needs a Class A roof, ember-resistant vents, protected windows and defensible space.

How do you handle earthquakes?

A structural engineer designs the reinforcing steel and connections for your soil and the seismic forces in the California Building Code. ICF walls are steel-reinforced concrete, so that engineering is part of the plans from the start.

Start Your ICF Home

Get Your Free ICF Consultation, Plan Review & Preliminary Budget

Tell us a little about your project. We'll take it from there.

  • 1
    Mary responds right awayMon–Fri 8 AM–5 PM · Sat 8 AM–1 PM. Sent after hours? We'll call you by 9 AM the next business day. A quick conversation about your lot, goals, budget and timing.
  • 2
    Plan & site reviewWe review your lot and plans — or your ideas — and what your county will require.
  • 3
    Preliminary budget & timelineSee what your ICF home will take, then decide. No obligation.
Prefer to talk now?(916) 586-8845
Free ICF Consultation

Tell us about your ICF home

Mary B., Client Relations Manager
Mary B.Client Relations Manager

Four required fields — the rest helps us prepare for your call. Nothing is shared outside Tenax.

Secure & private. No spam, ever.

Call Free Consultation